Turn a rough idea into a deck that moves the room — professional, pressure-tested, and entirely yours. Advance your ideas, and keep your name on every decision they drive.
The presentation tool to drive decisions and defend ideas. Build professional decks in minutes, pressure-test your argument with AI, and own every decision that follows — from your first pitch to your hundredth.
Forma ships with real collections — a library of templates, a library of frames, a set of shapes, 29 chart types, interactive blocks. You assemble, you don't start from zero.
Live HTML blocks — drill-down tables, movable GANTs, inputs. Things a slide could never do.
Professional charts straight out of the box — from the everyday column and line to the rarer bullet, radar and waterfall.
Ready containers — big-number blocks, notes & comment cards. Drop one in and fill it. Scale the whole group at once.
Every primitive a deck needs — rectangles, arrows, stars, callouts — all on your palette.
Double-click to create, press + for a matching object, drag to connect — right on the canvas, never a menu.
Years of boardroom craft are baked into one design system — palette, type, layout, charts. You don't make design choices; there are none left to make. You bring the message and drive the decision. Forma does the rest.
Eight families, ten calibrated steps each. A dedicated set for charts, and one colour for every meaning — all contrast-checked and tonal, never harsh. You'll never open a colour picker again.
Professional isn't a mode you switch on — it's the floor. Forma is built for people judged on their thinking, not their slides: palette, shades, spacing and charts are already handled, so the only thing left to bring into the room is your argument. The slide stays quiet, so the idea stays loud.
Clean white, editorial spacing, legible in any room. Backgrounds are one thing you'll never think about again.
Every slide gets the chart, table or figure that carries its point — proposed, placed, and aligned for you. Your job is what it says.
Neutral by default, one colour where the meaning is. The thing that matters is the thing they see — without you tuning anything.
Paste from anywhere — an old deck, a doc, a screenshot — and it arrives on one palette and one type system. Coherent by construction, with no one policing it.
Honest scales, real axes, zero chart-junk. Paste the numbers — the design is already done.
Tonal ink instead of harsh black, true hairlines, measured spacing — taste baked into every primitive, down to the last pixel.
One front door. Specialists who own their craft. A senior reviewer who wants you to win the room. Same names, faces and voices on every surface.
Anyone can make a slide look good. Forma is the only workspace that reviews whether the argument holds — before it reaches someone who'll notice that it doesn't.
Start free. Pay monthly, or save ~20% with annual billing.
| Free$0 | Light$10/mo | Standard$20/mo | Pro$25/mo | Ultra$60/mo | |
|---|---|---|---|---|---|
| Usage | |||||
| Forma tokens / mo | 1,000 | 8,000 | 18,000 | 25,000 | 80,000 |
| Storage | 1 GB | 5 GB | 20 GB | 30 GB | 50 GB |
| Core | |||||
| No watermark | – | ✓ | ✓ | ✓ | ✓ |
| Minutes & decisions | – | – | – | ✓ | ✓ |
| Share for review | ✓ | ✓ | ✓ | ✓ | ✓ |
| Share for merge | ✓ | ✓ | ✓ | ✓ | ✓ |
| Download PDF | – | ✓ | ✓ | ✓ | ✓ |
| Download PPT | – | – | – | ✓ | ✓ |
| Agents | |||||
| Shape specialist | ✓ | ✓ | ✓ | ✓ | ✓ |
| Chart specialist | ✓ | ✓ | ✓ | ✓ | ✓ |
| Table specialist | ✓ | ✓ | ✓ | ✓ | ✓ |
| Frame specialist | ✓ | ✓ | ✓ | ✓ | ✓ |
| Forma specialist | ✓ | ✓ | ✓ | ✓ | ✓ |
| Image specialist | – | – | ✓ | ✓ | ✓ |
| Victor Review | – | – | ✓ | ✓ | ✓ |
| Context | |||||
| Attach context | – | ✓ | ✓ | ✓ | ✓ |
| Doc input | – | ✓ | ✓ | ✓ | ✓ |
| PDF input | – | ✓ | ✓ | ✓ | ✓ |
| Image input | – | ✓ | ✓ | ✓ | ✓ |
| Skills | |||||
| Table image → chart | ✓ | ✓ | ✓ | ✓ | ✓ |
| Chart image → chart | – | ✓ | ✓ | ✓ | ✓ |
| PPT → Forma | – | – | – | ✓ | ✓ |
| Connectors | – | – | – | ✓ | ✓ |
| Start free | Choose plan | Choose plan | Choose plan | Choose plan | |
Each plan includes everything in the previous plans — plus more. Forma's features and offerings may evolve over time. Prices are exclusive of VAT and any other applicable taxes.
Every layout is pre-cooked and professional by default — curated packs for reviews, board updates and strategy memos, plus your own starred slides. You assemble; you never start from zero.
From the everyday column and line to the rare Gantt, waterfall, bullet and radar — every chart lands professional, on your palette, with axes and labels already worked out. And when you need to go further, the whole chart is real code underneath.


/* ─── 1. DATA ───────────────────────────── */ /* delta > 0 → Increase · delta < 0 → Decrease */ /* total: true → full column up to the level */ const steps = [ { name: "Start", delta: +120 }, { name: "Sales", delta: +80 }, { name: "Service", delta: +60 }, { name: "Subtotal", total: true }, { name: "Returns", delta: -30 }, { name: "Expenses", delta: -20 }, { name: "Total", total: true }, ]; /* ─── 2. SETTINGS ───────────────────────── */ const titleText = "Revenue Movement from Start to Total"; const subtitleText = "Revenue, $M"; /* Forma guideline colors */ const colorGain = "#1696d2"; // increase const colorLoss = "#1A1C20"; // decrease const colorTotal = "#C9C5BC"; // subtotal const showDataLabels = true; const showSubtotals = true;
Whatever the task, the right chart is a few clicks away — even a marimekko like this.

And it always looks the part — crisp, professional, boardroom-ready by default.

350 pre-built blocks across eight libraries — a container for every move a slide makes. You reach for "compare two options" or "state the takeaway", never "two-column layout". Drop one in, fill it, and it already lands on-brand.
Pulling a frame onto the slide and filling it — no menus, no formatting.
Every shape lands on your palette the instant you place it — so it's never off-brand. From there, tune anything that matters: fill and outline color, line weight and style, corner radius, exact size and ratio, layer order, and the text set right inside. The floor is fixed; the ceiling is yours.
Live HTML blocks that sit right on the canvas and actually respond — tables that recalculate, drill-downs, movable Gantts, sliders, scenario switches. If you can describe the behaviour, it can live on your slide. The blocks below are real — go ahead and play.
Limited only by your imagination — describe the behaviour in plain language, and it's built right on the canvas.
A genuinely smart, effortless canvas. Double-click to create any object, press + to grow a matching one, drag to connect two — it all happens right in place. You keep your hands on the work and stay out of the panels and menus.
Creating, matching and connecting objects — all on the canvas, no menus.
Anywhere on the canvas, any object appears right where you clicked — a shape, a chart, a table. No digging through an insert menu.
From any object, one click spawns another the same size. Same type? Every bit of formatting carries over — so a set stays a set.
Join two objects with a line by dragging between them. Flows, relationships, org charts — built without ever opening a panel.